Gas Technologies - Case Studies

Friday, April 26 9:00 AM - 10:30 AM

Location: Antigua B


Speakers


Description

This session covers case studies that range from energy market assessments to capture various revenue streams to a recently completed NGCC plant that utilized an aggressive schedule to achieve the original COD.

PRESENTATIONS INCLUDED (SPEAKERS LISTED ALPHABETICALLY, NOT IN PRESENTATION ORDER):
  • Development, Construction and COD of Two 475 MW CC Plants Based on M501GAC GTs
    Jeff Sweatland, Project Engineering Manager, Mitsubishi Hitachi Power Systems Americas, Inc.
    Co-Authors
    • Carlos Koeneke, Vice President, Project Engineering, Mitsubishi Hitachi Power Systems Americas, Inc.
    • Chris REGA, SVP Engineering, Construction, and Operations, NTE Energy
  • Flexible Generation in Action - A Case Study in the US Market
    Richard Saab, Mechanical Engineer, Siemens
  • Carty Generating Station Overcoming Contractor Challenges
    Jaisen Mody, Storage Consultant, EPRI Electric Power Research Institute

Tracks